Mt. Abram has a dedicated team of trail builders that are constantly updating and expanding terrain throughout the year. In 2022 we saw the start of the Main Side trail network with three new trails from the summit and our most advanced terrain to date. We also had a refresh of fan favorite trails George’s Jungle and Grease Slapper and the final completion of our jump trail, Whiplash.

In 2023 the trail crew will be working to bring you even more trail expansion on the Main Side as well as some exciting additions to the West Side. Some projects they will tackle include a reroute of the lower section of Super Chicken, improvements to the skills park and complete work started last summer on the advanced jump line.

Westside Trails

The origins of our bike park serviced by our Westside Lift include our most beginner friendly terrain, machine built flow trails and hand built technical trails.

Green:
  • Super Chicken (Easiest way down)
    Wide machine built flow trail
  • George’s Jungle
    Wide machine built flow trail
  • Sneaky Pete
    Cross Country style loop trail located near the top of Moosylvania
Blue:
  • Grease Slapper
    Wide machine built flow trail with larger berms and tabletops
  • Whiplash
    Wide machine built flow trail featuring larger berms, tabletops, jumps and spines
  • Pinball Wizzard
    Hand built technical trail featuring rock gardens, roll downs and switchbacks
  • Imu’s Climb
    Designated uphill trail – hand built
Black:
  • Yellow Jacket
    Hand built technical trail featuring rock gardens, roll downs, drops and bridges
  • Rock Bottom
    Hand built technical trail featuring advanced rock gardens, bridges and roll downs
Mainside Trails

Advanced & Expert terrain only

Our newest network of trails from the summit of Mt. Abram have our most advanced terrain available. The Mainside Lift runs on Saturday & Sunday from 9am – 4pm.

Black:
  • Ghoster 
    Hand built technical trail featuring rock gardens, roll downs & off camber turns
Double Black:
  • Bedrocker
    Hand built technical trail featuring rock gardens, roll downs & long rock slabs
  • PB & C
    Hand built technical trail featuring rock gardens, roll downs, drops and wooden berms. (This trail ends at the Main Side)